A container crane lifts a box, sets it down, and lifts the next one. Half of that working life is descending, and every descent turns the hoist motor into a generator. The only question is where the energy goes: into a resistor as heat, back into the grid, or into storage on the machine itself. On equipment that cycles several hundred times a shift, the answer shows up in the electricity bill and in how the supply is sized.
This follows the opening article in our hybrid energy storage series, which set out how a supercapacitor and a battery divide a duty cycle by time scale. Here the time scale stops being abstract: a hoist cycle is a concrete load profile with a known mass, a known height and a known number of repetitions per shift, and all three feed directly into how large a capacitor bank has to be. What the converter and the running control have to do with those numbers comes in a later piece.
Where the Energy Goes When the Load Comes Down
A hoist drive is a four-quadrant load. Lifting a container draws power from the DC bus; lowering it pushes power back. The motor does not know the difference, and with a modern variable-frequency drive the returning energy arrives at the bus as a rising voltage that something has to absorb.
The traditional answer is a braking resistor. A chopper switches the resistor across the bus whenever the voltage climbs past a threshold, and the energy leaves as heat. It is cheap, it never fails to work, and it throws away every joule the crane just paid to lift. On a machine doing several hundred lifts a shift, that is not a rounding error.
The alternative is to keep the energy. Feeding it back to the AC supply is possible, but it depends on the site: the supply has to accept reverse power, the local network has to tolerate the harmonics the regeneration brings, and in many ports the infrastructure was never built for it. Storing it on the machine avoids all of that. The crane becomes independent of what the grid is willing to take back.
Why This Duty Fits a Capacitor Better Than a Battery
What decides the choice here is what one shift does to the numbers, and those numbers favour a capacitor.
A container crane lifting twice a minute over an eight-hour shift completes close to a thousand hoist cycles. A lithium battery pack rated for a few thousand full cycles will not see the end of the year in that duty, and every one of those cycles is a small, shallow charge and discharge rather than a clean full one, which adds calendar and partial-state stress on top. A supercapacitor is specified for hundreds of thousands to a million cycles, and the hoist pattern is exactly the shape it handles well: short, frequent, high-power events.
The power side points the same way. A 40-tonne load moving at hoist speed represents several hundred kilowatts for a few seconds. Delivering that through a battery means oversizing the pack for a peak it will rarely see; a capacitor bank is sized for power first and energy second, which is the opposite trade and the cheaper one for an event this short.
The dividing line is duration. If the recovered energy has to be held across minutes, or moved around a shift, a battery is the right place for it, and the comparison between the two devices by load profile covers that boundary. For the seconds a single descent takes, the capacitor is doing the work it was built for.
Turning One Hoist Cycle Into a Number
The energy available in a descent is gravitational potential energy, and it is simple to estimate:
E = m × g × h
Take a 40-tonne load lowered through 15 m, with g at 9.81 m/s². The stored potential energy is 40,000 × 9.81 × 15, which is about 5.9 MJ, or roughly 1.6 kWh.
Not all of that reaches the DC bus. The gearbox and rope system take their share on the way down, and the motor and drive take another share on the way through. A combined efficiency of 70 to 80 percent is a reasonable planning figure, which puts the recoverable energy for this cycle at around 4.4 MJ, or 1.2 kWh.
That figure is close to the energy a household uses in an hour, delivered in a few seconds from a single lift. It also explains why a first pass at sizing usually surprises people in the other direction, which the next section shows.
Sizing the Bank From the Voltage Window It Is Allowed to Use
A capacitor bank stores energy in the swing between two voltages, not in a fixed amount:
E = ½ × C × (V1² − V2²)
Here V1 is the bus voltage the bank is charged to and V2 is the lowest voltage the drive and the converter can still work with. The swing matters as much as the capacitance, and widening it is often cheaper than adding cells.
For a 600 V DC bus that is allowed to fall to 450 V, and the 4.4 MJ from the example, the calculation gives:
C = 2 × 4.4 × 106 / (600² − 450²) ≈ 56 F
That 56 F is a 600 V rating, which is where the arithmetic gets interesting. A bank built from 2.7 V cells needs about 222 of them in series to reach that voltage, and series connection divides capacitance: a string of 3000 F cells becomes a 13.5 F string. Reaching 56 F means roughly four strings in parallel, or close to a thousand cells for one crane.
Full recovery of every lift is rarely the design point that emerges from that figure. Most installations recover part of the energy, or recover only the high-power part of the descent, because the marginal cell costs more than the marginal joule is worth. Deciding the recovery target is also the harder half of the job, since everything downstream scales with it.
What the Rest of the System Has to Do
A capacitor bank does not connect itself to a 600 V bus, and the supporting hardware is where projects go wrong.
A discharged bank looks like a short circuit, so the connection needs either a pre-charge circuit or a converter that can bring the voltage up gradually. Where the bus voltage and the bank voltage do not match across the whole swing, a bidirectional DC-DC converter sits between them and sets the limits on what the bank can actually deliver.
Series strings need voltage balancing. Cells of the same part number do not hold identical voltages, and without monitoring and balancing the weakest cell drifts up and ages first. Protection against overvoltage on the string is not optional when a 600 V bank is on board a machine that also carries people.
Then there is the environment. Port and yard equipment runs in salt air, wide temperature swings and constant vibration, and the bank enclosure has to be designed for that rather than inherited from a cabinet design. The cell families used for high-power banks are mostly rated over a wide temperature range, which helps, but the thermal path from cell to ambient is still the limiting factor in a sealed enclosure.
Where Recovery Pays and Where It Does Not
Not every lift is worth recovering, and a design that assumes it is will be oversized.
The best case is a loaded descent from height, repeated often, on a machine whose supply cannot take power back. That is the duty the calculation above describes, and it is where the payback is shortest.
The weak cases are easy to list. An empty hook coming down carries little stored energy, so the recovered fraction of a shift’s total is smaller than the count of descents suggests. Equipment that lifts rarely, or lowers loads only from short heights, has little to recover for the same capital cost. And where the site can already return power to the grid efficiently, the value of storing it on the machine is reduced to whatever ride-through and power-quality benefit the bank adds on its own.
A practical way to decide is to count the energy, not the cycles: work out the recoverable joules of one typical descent and multiply by the number of descents in a shift. If that total is small relative to the machine’s daily consumption, the project is a power-quality improvement rather than an energy project, and it should be justified on that basis instead.
Everything above assumes a bank connects and behaves as simply as the arithmetic suggests. On a working machine it does not, and the next piece in this series takes up what the converter has to do about a bank whose voltage falls as it discharges, and how the power split is handled while the crane is running.
Questions About Crane Energy Recovery
Can a crane run on supercapacitors alone?
Not in this application. The bank in the example holds the energy of one descent, not the energy of a shift, and a crane that had to run on stored energy between charging opportunities would need a battery or a connection to the supply. The capacitor covers the seconds-long events; the supply covers everything longer.
How long do the cells last in a hoist duty?
The cycle count is not what limits them. Hundreds of thousands of shallow cycles sit well inside what the cells are rated for. What limits them is calendar aging and temperature, the same two factors behind the lifetime figures quoted for these devices, which makes the enclosure and its thermal design more important than the cycle count in this application.
Do I still need the braking resistor?
Most designs keep it. The bank has a ceiling: once it is fully charged, further descent energy has nowhere to go, and a resistor gives the drive somewhere safe to put it. Keeping the resistor as a fallback also means the crane stays operable when the bank is out of service.
What happens when the bank is full?
The drive stops pushing energy into it and reverts to the resistor, or limits the lowering speed. A bank sized for typical descent energy will reach full charge on a long or heavily loaded descent, so the control has to expect that case rather than treat it as a fault.
If you are working out a bank size for a hoist or any other high-cycle duty, send us the load, the travel, the number of cycles and the bus voltage. Xuansn manufactures supercapacitor cells and modules for high-power duty, including the 2.7 V and 3 V cell series used in series strings of this kind, and our engineers will come back with a capacity figure, a string configuration and the balancing and pre-charge requirements that go with it. Our selection guide covers how the cell families differ.